Contract No. HY/2002/19
Yuen Long Highway

Contract No.

:HY/2002/19

Project Title

:Widening of Yeun Long Highway between
 Tan Kwai Tsuen and Shap Pat Heung
 Interchange

PWP No.

:6721TH

Employer

:Highways Department
 Major Works Project Management Office

Consultant

:Scott Wilson Ltd.

Contractor

:Paul Y. Construction Co. Ltd.

Contract Sum (Original)

:HK $678M

Contract Period

:1326 days

Contract Award Date

:8 July 2003

Contract Commencement Date

:18 July 2003

Anticipated Completion Date

:4 March 2006

Anticipated Completion Date for Establishment Work

:3 March 2007

 

Project Scope

The scope of Works includes:

(a)    widening of the approximately 4.5 km long section of Yuen Long Highway from a dual two-lane to a dual three-lane carriageway between Tan Kwai Tusen and Shap Pat Heung Interchanges;

(b)    provision of a hard shoulder of 3.65 m wide and a 1 m wide marginal strip to each carriageway;

(c)    modifying the existing interchanges and associated slip roads affected by the proposed road widening;

(d)    widening or extending existing highway structures affected by the proposed road widening;

(e)    construction of noise barriers and provision of noise reducing road surfacing;

(f)      associated works including road rehabilitation, geotechnical, drainage, street furniture, lighting, landscaping, traffic signs, gantries and civil provision of installation of traffic control and surveillance system; and

(g)    entrusted sewerage works including 1.3km of twin rising main.