Contract
No. HY/2002/19
Yuen
Long Highway
Project Scope The scope of Works includes: (a) widening of the approximately 4.5 km long section of Yuen Long Highway from a dual two-lane to a dual three-lane carriageway between Tan Kwai Tusen and Shap Pat Heung Interchanges; (b) provision of a hard shoulder of 3.65 m wide and a 1 m wide marginal strip to each carriageway; (c) modifying the existing interchanges and associated slip roads affected by the proposed road widening; (d) widening or extending existing highway structures affected by the proposed road widening; (e) construction of noise barriers and provision of noise reducing road surfacing; (f) associated works including road rehabilitation, geotechnical, drainage, street furniture, lighting, landscaping, traffic signs, gantries and civil provision of installation of traffic control and surveillance system; and (g) entrusted sewerage works including 1.3km of twin rising main. |